Hambantota Port Project


Development Of Port in Hambantota
Pics by Eng.Kasun Dasantha

With a view to realization of the full potential of the development of harbour facility in Hambantota and recognition of integrating port development with regional development, a comprehensive consultancy study utilizing consultant having experience in greenfield port construction whose work has been acceptable to international lending agencies is in the final stage.

Port of Hambantota is planned as a Service and Industrial Port and subsequently it could be developed as a transshipment port depending on the increasing cargo volumes.

In view of urgency, short term plan has been prepared for a service port as phase 1 of the project in order to cater for the immediate demands in accordance with the master plan. The Main components are two nos. of berth with 500m length, and the Breakwater of about 1.8 km and the proposed port will have depth of 15m. presently negotiations are being held with Government of China for funding arrangements.




Main Parts Of Hambantota Port Construction Phase 1

  1. Break Water Construction
  2. Basing and Approach channel excavation (Dredging and Dry Excavation )
  3. Quay Wall Construction